Blueprint diagram of a formed concrete pour — diagram art
Concrete · Chester County★ 5.0 · 39 Google reviews

Pours that hold their line.

Concrete flatwork and re-pours across Chester County — formed, based, poured, and finished to the same standard as everything else that carries the 8:28 name.

The honest problem

Concrete forgives nothing after the truck leaves

A pour is decided before it starts: the base, the forms, the reinforcement, and the drainage around it. Shortcuts there become cracks and puddles that no finish can hide.

828 treats concrete like the rest of the craft — scoped plainly, formed carefully, and finished clean, including the re-pours that finish a lateral or excavation job properly.

Concrete work we take on

  • Flatwork pours — formed, based, and finished
  • Re-pours of sections cut for excavation and lateral work
  • Drainage-aware grading around new pours
  • Restoration pours that match the surrounding surface

How the work runs

Step by step

01

Walk the site

The surface, the drainage, and what the pour has to survive — scoped on site with Kenny.

02

Form & base

Excavation to depth, compacted base, forms set to line and grade. This is the part that decides the finish.

03

Pour & finish

Concrete placed, screeded, and finished; control joints cut where the slab needs them.

04

Cure & hand back

The pour cures on its schedule, forms come off, and the surrounding grade and surface are restored.

From the manifest

The work, labelled

Blueprint diagram of a formed concrete pour — diagram art
Concrete flatworkReference imagery

Objections, answered

Before you ask

Do you re-pour concrete cut during other work?

Yes — when a lateral or excavation job cuts through a driveway, walk, or patio, re-pouring the cut sections is part of finishing the job, and on lateral work restoration is always included.

How long before we can use a new pour?

Light foot traffic is usually fine after a day or two; vehicles and full loads wait longer, and full cure takes about four weeks. We'll give you the exact guidance for your pour before we leave.

Why does the base matter so much?

Concrete is only as stable as what's under it. A compacted, well-graded base is what keeps a slab from settling and cracking — it's the step we never rush.

Can you fix drainage around an existing slab?

Often, yes — grading and drainage corrections around existing concrete are part of the excavation side of the business. Kenny will tell you on the walkthrough whether a correction or a re-pour is the honest fix.

Proof

★ 5.05.0 · 39 Google reviews, every one 5 stars
★★★★★
“Kenny arrived on time, talked me through my options, handled a last-minute drainage addition without a hitch, and the work is exactly what I asked for.”
Erica Yip · Google review

Every review on this page is a published Google review, word for word. Every photo is labelled — real 828 work or reference imagery. Nothing in between.

Start with a consult

Talk to Kenny first.

The consult is a free 90-minute in-home walkthrough — scope, constraints, and honest next steps.

Beside the decision — a verbatim review
“Kenny arrived on time, talked me through my options, handled a last-minute drainage addition without a hitch, and the work is exactly what I asked for.”
Erica Yip · Google review